An empty shell doesn't make money. Elevate turns raw or dated commercial space into finished, code-compliant environments your business can open in.
Offices, retail, restaurants, fitness, entertainment, and specialty concepts — we work from your architect's drawings or help you develop scope from a test fit. Demolition, framing, drywall, doors and hardware, millwork, flooring, paint, specialties, and coordination of mechanical, electrical, plumbing, fire protection, and low voltage — sequenced to hit your opening date.
From shell or second-generation space.
With site protection and clean handoff.
Up to Level 5 finish for critical walls.
Hardware, casework, and specialties.
Flooring, tile, and paint packages.
Licensed subs; clearly-flagged allowances.
Blocking and conduit for owner-furnished equipment — simulators, kitchen, AV.
Drawing takeoff, allowance strategy for MEP scopes, clear exclusions.
Doors, storefronts, and specialty items ordered early.
Sequenced trades, weekly updates, landlord and property management coordination.
Inspections, punch list, final cleaning, keys.
Yes — COIs, building rules, freight elevator scheduling, and after-hours work are standard for us, including condo and high-rise conditions.
Yes. MEP scopes are priced as clearly-flagged allowances and trued up when licensed sub bids land — you see the change before it's committed.
A typical 2,000–5,000 SF buildout runs 8–16 weeks after permit, depending on scope and long-lead items.
Yes — prep, blocking, and conduit coordination for owner-furnished systems like simulators, kitchen equipment, and AV.
Related: General Contracting · Framing & Drywall · Low Voltage
We'll turn around a scoped estimate with allowances clearly flagged.
Get a Buildout Estimate Call (404) 719-1888